Chesapeake Demolition Costs & Prices
Chesapeake, Virginia. The Chesapeake Demolition Cost Report is a concise report on everything you need to know about the cost of demolition in the Chesapeake area.
|
Average Demolition Cost in Chesapeake
We have done a little research to find the average cost of demolition in Chesapeake. Here are the average costs and prices reported back to us:
Cost of House Demolition in Chesapeake, Virginia$12,696.43 fixed fee (house with basement) (Range: $9,096.43 - $16,296.43) Free Estimates from Local ProsCost of Pool Demolition in Chesapeake, Virginia$11,560.00 fixed fee (in-ground pool, complete demo) (Range: $5,780.00 - $17,340.00) Free Estimates from Local ProsCost of Concrete Sawing, Demolition or Removal in Chesapeake, Virginia$5.21 per square foot (for demolition and removal of 4" slab) (Range: $4.18 - $6.24) Free Estimates from Local Pros |
Was
this information helpful?
|
Chesapeake Demolition Cost Data
Professionals in the Chesapeake area have provided information about how much demolition cost(s). Here are some of the individual reports:
23321, Chesapeake, Virginia - February 17, 2024
Pool Demolition$13.50 per square foot $5,000.00 to $15,000.00 fixed fee (in-ground pool, complete demo) $300.00 to $800.00 fixed fee (above ground pool) $4,000.00 to $16,000.00 fixed fee (in-ground pool, partial demo) Our billing is simple. We will place everything on the bid so the costumer can see everything that is being paid for. All estimates are free.
Reported by: Gerard Pelletier, American Crushing Company |
23320, Chesapeake, Virginia - July 2, 2018
Pool Demolition$7,100.00 - $21,300.00 fixed fee (in-ground pool, complete demo) Price of complete pool demolition includes hauling but does not include landscaping or sodding.
Reported by: ProMatcher Research Team |
23320, Chesapeake, Virginia - June 30, 2018
House Demolition$9,575.00 - $15,250.00 fixed fee (house with basement) Cost of demolition and waste removal.
Reported by: ProMatcher Research Team |
23320, Chesapeake, Virginia - May 10, 2018
Concrete Sawing, Demolition or Removal$5.14 - $7.67 per square foot (for demolition and removal of 4" slab) Cost includes labor for concrete demolition. Also includes demolition and removal of unreinforced concrete slab (driveway, patio, etc.). Items not included: demolition of reinforced concrete or slabs greater than 4" thick.
Reported by: ProMatcher Research Team |
23601, Newport News, Virginia - June 17, 2021
House Demolition$15,000.00 to $40,000.00 fixed fee (house, no basement) $20,000.00 to $40,000.00 fixed fee (house with basement)
Reported by: ProMatcher Research Team |
23702, Portsmouth, Virginia - July 2, 2018
Pool Demolition$5,685.00 - $17,055.00 fixed fee (in-ground pool, complete demo) Includes cost for labor and debris hauling.
Reported by: ProMatcher Research Team |
23501, Norfolk, Virginia - July 2, 2018
Pool Demolition$5,535.00 - $16,605.00 fixed fee (in-ground pool, complete demo) This price estimate includes complete pool demolition and hauling cost.
Reported by: ProMatcher Research Team |
23670, Hampton, Virginia - July 2, 2018
Pool Demolition$5,485.00 - $16,455.00 fixed fee (in-ground pool, complete demo) This estimated price quote includes complete pool demolition.
Reported by: ProMatcher Research Team |
23607, Newport News, Virginia - July 2, 2018
Pool Demolition$5,585.00 - $16,755.00 fixed fee (in-ground pool, complete demo) Estimated price quote includes complete pool demolition hauling and labor.
Reported by: ProMatcher Research Team |
23707, Portsmouth, Virginia - July 2, 2018
Pool Demolition$5,435.00 - $16,305.00 fixed fee (in-ground pool, complete demo) This price estimate includes the cost of complete pool demolition and debris hauling.
Reported by: ProMatcher Research Team |
23450, Virginia Beach, Virginia - July 2, 2018
Pool Demolition$5,635.00 - $16,905.00 fixed fee (in-ground pool, complete demo) Price includes labor, and debris hauling.
Reported by: ProMatcher Research Team |
23702, Portsmouth, Virginia - June 30, 2018
House Demolition$9,200.00 - $12,825.00 fixed fee (house with basement) Demolition cost does not include toxic material disposal or tree removal.
Reported by: ProMatcher Research Team |
23450, Virginia Beach, Virginia - June 30, 2018
House Demolition$9,800.00 - $12,400.00 fixed fee (house with basement) Includes time and materials for house demolition.
Reported by: ProMatcher Research Team |
23670, Hampton, Virginia - June 30, 2018
House Demolition$7,850.00 - $18,800.00 fixed fee (house with basement) Cost of demolition, location clean-up, waste removal.
Reported by: ProMatcher Research Team |
23707, Portsmouth, Virginia - June 30, 2018
House Demolition$9,450.00 - $18,700.00 fixed fee (house with basement) This includes the cost of house demo and removal of wreckage.
Reported by: ProMatcher Research Team |
23501, Norfolk, Virginia - June 30, 2018
House Demolition$9,000.00 - $20,350.00 fixed fee (house with basement) Must have an easy way to enter the site or additional charges will apply.
Reported by: ProMatcher Research Team |
23607, Newport News, Virginia - June 30, 2018
House Demolition$8,800.00 - $15,750.00 fixed fee (house with basement) Includes demolition, debris removal, and equipment rental in estimate.
Reported by: ProMatcher Research Team |
23501, Norfolk, Virginia - May 10, 2018
Concrete Sawing, Demolition or Removal$4.01 - $5.98 per square foot (for demolition and removal of 4" slab) Cost includes demolition and removal of concrete. Includes unreinforced concrete demolition, removal and disposal. Items excluded: permit inspections and concrete sawing.
Reported by: ProMatcher Research Team |
23670, Hampton, Virginia - May 10, 2018
Concrete Sawing, Demolition or Removal$3.97 - $5.92 per square foot (for demolition and removal of 4" slab) Estimate includes labor. Cost takes into account demolition and removal of unreinforced concrete slab (driveway, patio, etc.). Excludes demolition of reinforced concrete or slabs greater than 4" thick.
Reported by: ProMatcher Research Team |
23450, Virginia Beach, Virginia - May 10, 2018
Concrete Sawing, Demolition or Removal$4.08 - $6.09 per square foot (for demolition and removal of 4" slab) Price considers the cost of demolition and removal of concrete. Estimate includes unreinforced concrete demolition, removal and disposal. Does not include permit inspections and concrete sawing.
Reported by: ProMatcher Research Team |
23707, Portsmouth, Virginia - May 10, 2018
Concrete Sawing, Demolition or Removal$3.93 - $5.87 per square foot (for demolition and removal of 4" slab) Cost includes labor for demolition and removal of concrete. Also includes unreinforced concrete demolition, removal and disposal. Items not included: permit inspections and concrete sawing.
Reported by: ProMatcher Research Team |
23607, Newport News, Virginia - May 10, 2018
Concrete Sawing, Demolition or Removal$4.04 - $6.03 per square foot (for demolition and removal of 4" slab) This estimate includes concrete demolition. Also includes removal of 4" concrete slab and cleanup (hauling and disposal). There is an additional cost for demolition of reinforced concrete or slabs greater than 4" thick.
Reported by: ProMatcher Research Team |
23702, Portsmouth, Virginia - May 10, 2018
Concrete Sawing, Demolition or Removal$4.12 - $6.14 per square foot (for demolition and removal of 4" slab) Price takes into account labor. It also includes unreinforced concrete demolition, removal and disposal. Does not include permit inspections and concrete sawing.
Reported by: ProMatcher Research Team |
|
|
|
|
Chesapeake Demolition Contractors
SPONSOREDAmerican Crushing Company5300 West Military HighwayChesapeake, VA(919) 988-5472
|
VB Services 602 Thomas Nelson dr, Virginia Beach, VA 757-778-2645
|
Alpha & Omega Repair, Inc. Hampton, VA 7578501787
|
|
|
|