43123, Grove City, Ohio - October 26, 2022
Pool Demolition$10,000.00 to $25,000.00 fixed fee (in-ground pool, complete demo) $8,000.00 to $20,000.00 fixed fee (in-ground pool, partial demo) How many yards of soil l and machine access
Reported by: Michael Miller, M&T Demolition and Construction LLC |
43123, Grove City, Ohio - October 26, 2022
House Demolition$9.00 to $14.00 per square foot Based off of type of materials, access and location
Reported by: Michael Miller, M&T Demolition and Construction LLC |
43113, Circleville, Ohio - May 30, 2019
Concrete Sawing, Demolition or Removal$25.00 to $35.00 per hour $3.50 to $5.50 per square foot (for demolition and removal of 4" slab) $0.60 to $0.85 per linear foot (for saw cutting 4" slab)
Reported by: ProMatcher Research Team |
43216, Columbus, Ohio - July 2, 2018
Pool Demolition$4,600.00 - $13,800.00 fixed fee (in-ground pool, complete demo) This price estimate includes and hauling.
Reported by: ProMatcher Research Team |
43216, Columbus, Ohio - June 30, 2018
House Demolition$9,400.00 - $17,500.00 fixed fee (house with basement) Cost estimate for demolition and removal of waste.
Reported by: ProMatcher Research Team |
43216, Columbus, Ohio - May 10, 2018
Concrete Sawing, Demolition or Removal$3.33 - $4.97 per square foot (for demolition and removal of 4" slab) Quote estimate includes labor. Also includes demolition and removal of unreinforced concrete slab (driveway, patio, etc.). Cost does not account for demolition of reinforced concrete or slabs greater than 4" thick.
Reported by: ProMatcher Research Team |