|
Hilton Head Island Demolition Costs & Prices
Hilton Head Island, South Carolina. The Hilton Head Island Demolition Cost Report is a concise report on everything you need to know about the cost of demolition in the Hilton Head Island area.
|
Average Demolition Cost in Hilton Head Island
We have done a little research to find the average cost of demolition in Hilton Head Island. Here are the average costs and prices reported back to us:
Cost of Pool Demolition in Hilton Head Island, South Carolina$10,965.00 fixed fee (in-ground pool, complete demo) (Range: $5,482.50 - $16,447.50) Free Estimates from Local ProsCost of Concrete Sawing, Demolition or Removal in Hilton Head Island, South Carolina$4.95 per square foot (for demolition and removal of 4" slab) (Range: $3.97 - $5.92) Free Estimates from Local Pros |
Was
this information helpful?
|
Hilton Head Island Demolition Cost Data
Professionals in the Hilton Head Island area have provided information about how much demolition cost(s). Here are some of the individual reports:
29926, Hilton Head Island, South Carolina - July 2, 2018
Pool Demolition$5,705.00 - $17,115.00 fixed fee (in-ground pool, complete demo) Price estimate includes clearing complete pool demolition. Cost estimate excludes landscaping or sodding.
Reported by: ProMatcher Research Team |
29926, Hilton Head Island, South Carolina - May 10, 2018
Concrete Sawing, Demolition or Removal$4.13 - $6.16 per square foot (for demolition and removal of 4" slab) This estimated quote includes concrete demolition. It also includes removal of 4" concrete slab and cleanup (hauling and disposal). Cost excludes demolition of reinforced concrete or slabs greater than 4" thick.
Reported by: ProMatcher Research Team |
29902, Beaufort, South Carolina - July 2, 2018
Pool Demolition$5,260.00 - $15,780.00 fixed fee (in-ground pool, complete demo) Cost includes debris hauling, and labor.
Reported by: ProMatcher Research Team |
29902, Beaufort, South Carolina - May 10, 2018
Concrete Sawing, Demolition or Removal$3.81 - $5.68 per square foot (for demolition and removal of 4" slab) Cost estimate takes into account the price of concrete demolition. Price includes demolition and removal of unreinforced concrete slab (driveway, patio, etc.). Excludes demolition of reinforced concrete or slabs greater than 4" thick.
Reported by: ProMatcher Research Team |
|
|
|
|
Hilton Head Island Demolition Contractors
|
|
|
|
|
Disclaimer: Costs and prices shown on the ProMatcher site are intended to be used as general information, not as guaranteed estimates. To obtain cost information relevant to your project, request a quote or estimate from a local service provider.
|